Cold-Work Repair Restores Ruptured 4-Inch Gas Service

Completed LOKRING cold-work cap on a 4-inch gas service line in a trench, emergency gas line repair Queensland

GripTight® Test Plugs Cut Hydrostatic Pipe-Testing Time

GripTight test plug installed on a stainless steel pipe spool set up for hydrostatic pressure testing

CarbonSeal™ HT1 Reinforces Severely Thinned Slurry Pipeline

Above-ground slurry pipelines in Queensland with a carbon fibre composite repair band on the steel line

Hydrotesting of Pipeline Strings for HDD sections

Localised corrosion on a live gas-venting wellhead in New Zealand required a rapid, engineered composite wrap repair – sealing an active pinhole leak with zero hot work.

PNG Rainforest Pipeline Dent Repair

Localised corrosion on a live gas-venting wellhead in New Zealand required a rapid, engineered composite wrap repair – sealing an active pinhole leak with zero hot work.

Proving High-Temperature Composite Repairs – CarbonSeal HT1

Localised corrosion on a live gas-venting wellhead in New Zealand required a rapid, engineered composite wrap repair – sealing an active pinhole leak with zero hot work.

Offshore – Lokring Weld-Free Closed Drain Line Replacement

Following a major earthquake in Papua New Guinea, a power station needed critical piping replaced fast, with no qualified welders available. Pipeserv engineered a weld-free solution using Lokring mechanical fittings, restoring operations with minimal downtime and significant cost savings over conventional welding.

Air Cooled Heat Exchanger Repair

Pipeserv technicians operating in PNG

Following a major earthquake in Papua New Guinea, a power station needed critical piping replaced fast, with no qualified welders available. Pipeserv engineered a weld-free solution using Lokring mechanical fittings, restoring operations with minimal downtime and significant cost savings over conventional welding.

Steam Condenser Tube Plugging

Heat Exchanger Repair

Following a major earthquake in Papua New Guinea, a power station needed critical piping replaced fast, with no qualified welders available. Pipeserv engineered a weld-free solution using Lokring mechanical fittings, restoring operations with minimal downtime and significant cost savings over conventional welding.

Lokring Pipe Repair PNG – Weld-Free Power Station Solution

Lokring pipe repair

Following a major earthquake in Papua New Guinea, a power station needed critical piping replaced fast, with no qualified welders available. Pipeserv engineered a weld-free solution using Lokring mechanical fittings, restoring operations with minimal downtime and significant cost savings over conventional welding.