Cruise Ship Condenser Leak Plugged With Pop-A-Plug® in One Day

With one day alongside and no tube data on hand, PIPESERV located a leaking condenser tube and sealed it with Pop-A-Plug® tube plugs.

2 hours

Repair Time

No

Hot work required

Pop-A-Plug

Repair System

Project overview

Location
Australia
Industry
Marine
Repair solution
Pop-A-Plug® Heat Exchanger Tube Plugging System with tube leak testing tools (EST Group, Curtiss-Wright)

The Challenge

An international luxury cruise liner developed a leak in a shell-and-tube condenser on one of its chiller units, and the vessel had only one day alongside before it was due to sail. Cruise ship condenser leak repair on that timeline leaves no room to order parts: the leak has to be found and fixed, and the condenser closed up, inside the port window. Making it harder, only limited detail was available on tube sizes and the other specifics normally used to select leak test tools and plugs. A standard approach of surveying the bundle, ordering plugs to suit and returning to install them was not an option.

Our Solution

PIPESERV mobilised a technician to the vessel with a contingency kit drawn from its own inventory: tube leak testing tooling and a range of Pop-A-Plug® heat exchanger tube plugs from EST Group (Curtiss-Wright) to cover the likely tube sizes. With the condenser end cover opened, the technician tested the tubes individually with the G-Series tube tester to pinpoint the leaking tube. The leaking tube was then sealed with Pop-A-Plug® engineered mechanical tube plug.

Results

The leak was located and repaired promptly, inside the vessel’s single day in port. Because PIPESERV carried the test tooling and plugs as contingency stock, the job did not wait on exact tube dimensions or freight. This Luxury cruise ship condenser leak repair needed no welding and no hot work, and the rest of the condenser tubes stayed in service.

Frequently Asked Questions

What is cruise ship condenser leak repair with Pop-A-Plug® tube plugs?
It is a mechanical repair that isolates a leaking condenser tube by sealing it at the tube sheet, so the rest of the condenser keeps working. Pop-A-Plug® plugs are installed hydraulically or with a manual tool, with no welding or explosives, and are a mechanical tube plug method described in ASME PCC-2. Pop-A-Plug® CPI/Perma plugs install in minutes, which suits a ship with a short port window.
Each tube is tested individually with a tube tester that seals the tube end and pressurises or evacuates it while a gauge is watched for a drop. A tube that will not hold pressure or vacuum is the leaker. EST Group’s G-Series tube testers run on standard compressed air at 40–125 psig (2.7–8.5 barg) and cover tube IDs from 7.1 mm upwards.
Yes, if the right range of tooling travels with the technician. On this job PIPESERV carried leak test tooling and Pop-A-Plug® plugs from its own inventory to cover the likely sizes. Pop-A-Plug® CPI/Perma plugs have a broad expansion range that fits multiple tube gauges, across tube IDs from 11.99 mm to 52.5 mm.
Yes. Standard plug materials include 70/30 copper-nickel, brass, titanium, stainless steel, carbon steel and duplex. The plug material is matched to the tube material, which avoids thermal expansion mismatch and unwanted galvanic interaction, and EST Group publishes a specific tube preparation procedure for copper-nickel and brass tubes.

Have a similar challenge?

Unplanned downtime is costly. Whether it's an emergency or a planned repair, Pipeserv has the products, expertise and partners to get your asset back online fast.

Other Case Studies

Cruise Ship Condenser Leak Plugged With Pop-A-Plug® in One Day

14 LOKRING Fittings, Zero Welds, One Gas Plant Shutdown

Cold-Work Repair Restores Ruptured 4-Inch Gas Service